Residential & Commercial Roofing in Mi Wuk Village
Mi Wuk Village Roofing & Maintenance offers a complete range of roofing services in Mi Wuk Village and Dunsmuir, Goodyears Bar, Kings Beach, Mammoth Lakes, North Hollywood. Every job gets the same attention. Big or small.
Roof Replacement
After tear-off, we always check decking and replace what's needed. Soft spots mean moisture intrusion. The old roof was leaking longer than you realized. We use 7/16" or 15/32" CDX plywood depending on rafter spacing. New decking costs $75-$120 per sheet installed. We only replace what's actually damaged.
Get a Free Quote โRoof Repair
Improper step flashing is the leading cause of roof leaks at wall-to-roof transitions. Step flashing needs to be woven between shingle courses with each piece extending 4" above the shingle exposure. We see Mi Wuk Village homes where the last roofer used continuous L-flashing or just caulked the gap. That always fails. We tear it out and install proper step flashing with a kick-out diverter at the bottom per IRC R905.2.8.3.
Get a Free Quote โStorm Damage Repair
After every major storm in Mi Wuk Village, out-of-town companies flood the area offering free inspections. They're not all bad, but many are. We're local, we're licensed, and we'll be here to honor the warranty. Storm chasers won't be.
Get a Free Quote โNew Roof Installation
Building a custom home in Mi Wuk Village? We work directly with you and your architect on material selection, color coordination, and budget planning. From designer shingles to standing seam metal, we install it all and back it with manufacturer plus workmanship warranties.
Get a Free Quote โMetal Roofing
We install 24-gauge and 26-gauge steel standing seam panels in Galvalume and pre-painted finishes. Concealed fastener clips allow the panels to expand and contract with temperature changes without stress on the fasteners. That's why standing seam doesn't leak. The clips float.
Get a Free Quote โShingle Roofing
We install every major shingle brand: GAF Timberline HDZ, Owens Corning Duration, CertainTeed Landmark, Atlas Pinnacle, Tamko Heritage, Malarkey Vista, and IKO Cambridge. Each brand has different warranty tiers, wind ratings, and price points. We help you compare without pushing one brand over another.
Get a Free Quote โFlat Roofing
TPO single-ply membrane in 60-mil or 80-mil thickness, fully adhered or mechanically attached over minimum R-25 polyiso insulation. Hot-air welded seams tested with a probe at every joint. We install per NRCA and manufacturer specifications with tapered ISO insulation creating minimum 1/4" per foot positive drainage. Ponding water is the number one cause of flat roof failure in Mi Wuk Village. Tapered insulation eliminates it. FM 4473 rated systems available for hail-prone areas. Fully warranted by Carlisle, Firestone, or GAF.
Get a Free Quote โCommercial Roofing
Multi-family properties in Mi Wuk Village need roofing contractors who understand occupied buildings. We schedule around tenants, contain debris, and minimize noise during reasonable hours. Emergency leak repairs get priority. Water in someone's apartment is an emergency.
Get a Free Quote โGutter Installation
We install gutter guards for homeowners who are done cleaning gutters twice a year. Micro-mesh over the opening, screwed into the front lip. Leaves and pine needles sit on top and blow off. Not 100% maintenance-free, but close. You might hose them once a year.
Get a Free Quote โRoof Inspection
Annual inspections catch small problems early. A cracked pipe boot is a $150 repair. A year of water leaking through that crack causes $3,000+ in ceiling, insulation, and drywall damage. We recommend an inspection every 2-3 years for newer roofs, annually for roofs over 15 years.
Get a Free Quote โEmergency Roof Repair
After we secure the tarp and stop the leak, we photograph and document everything while the damage is fresh. This documentation is critical for insurance claims. Adjusters want to see the damage before any repairs are made.
Get a Free Quote โSkylight Installation
Skylight installation includes cutting the roof opening, framing a curb with doubled 2x lumber, installing the unit with factory sealant, and weaving the step flashing into the surrounding shingle courses. Interior work includes drywall framing and trim. We handle the full job in Mi Wuk Village. Outside and inside.
Get a Free Quote โ